You Win or You Win

With Net Metering, you benefit from producing your own energy and also gain from selling it. It is a win-win situation for all involved.

Green Energy Icon

Power Distribution
Companies

Why is This Service Helpful?

This state-of-the-art portal will bring the Net Metering service to your doorstep with accessibility and smart features.

Saves Time

Significantly reduces the time and effort required for utility consumers, it is now possible to obtain permission for net metering from your home or office

Online Payment

A hassle-free way to pay inspection and miscellaneous bills online anytime, from anywhere

Cost-Effective

Eliminates the need to repeatedly travel to utility offices, saves both time and transportation costs

Easy Tracking

Effortless application tracking from submission to completion without office visits or inquiries via phone or email

Thematic drawing of Net Energy Metering

The Process

The onboarding process is straightforward, comprising only six steps, beginning with your application. The remaining steps are simple and time-bound.

Net Metering Guideline
Step 01

Apply for Net Metering

To obtain permission for solar system installation for net metering, you must submit an online application. Please follow the steps below:

  1. Click on the"Apply Now" link to access the application form.
  2. Select your utility and provide the Consumer Account Number.
  3. Fill up the required information.
  4. Agree to the terms and conditions, then Submit the Application.

After submitting the application, you will receive your login ID and password for dashboard access via SMS and email.

Apply Online
Step 02

Location will be Inspected

In this stage, the utility office will perform the following activities:

  1. Verify the application and either accept or return it.
  2. Schedule a date for a location visit and notify you via SMS and email.
  3. A field visitor will visit your location and submit the field visit report to the approval authority.
Step 03

Application will be Approved

In this stage, the utility office will perform the following activities:

  1. Verify the field visit report and either approve or reject it.
  2. Grant permission for the system installation and notify you via SMS and email. The process from inspection to approval will take a maximum of 10 working days.
Step 04

You can Install the Solar System

In this stage, you need to perform the following activities:

  1. Install the solar system according to the guidelines provided by the utility office.
  2. After installation, submit an application for system evaluation (2nd application).
Step 05

An Evaluation will be Conducted

In this stage, the utility office will perform the following activities:

  1. Verify the application for system evaluation, schedule a date for a location visit, and notify you via SMS and email.
  2. A concerned official will visit your location, evaluate the installed system, and submit the evaluation report to the approval authority.
Step 06

An Agreement will be Signed

In this stage, the utility office will perform the following activities:

  1. Verify the system evaluation report and approve it based on bill clearance, schedule a date for agreement signing, and notify you via SMS and email.
  2. Sign the agreement with you on the scheduled date. The process from evaluation to agreement will take a maximum of 15 working days.

Video Tutorial

Wing Left Wing Left

The video tutorial in Bengali is to guide in onboarding the users into the application process, the login process, and managing the applications

Technical Support: Logo of GIZ and GoB
Development and Maintenance: TechnoVista Limited